October 29, 2026
The farm stand at Routes 22 and 28 has sold produce on the same three acres for about 80 years. It has never been an approved use of that land. On Oct. 13, Bridgewater's zoning board approved a 106,000-square-foot self-storage facility on the corner, and that vote changed the stand's legal footing. The building residents spent 20 months arguing against is the reason a farmstand is now written into the site's approval.
That matters most this time of year. The stand is about to close for the winter, as it does every year. This is the first off-season in which its return depends on conditions attached to the property, not only on whoever happens to own the land.
The stand started as Bob's Fruit Stand, run by the Kiser family from 1946. According to Melick's own page, that name stayed in use until 2005, and the Melick family has now run the stand for 22 years. They farm out of Oldwick in Hunterdon County, and Rebecca Melick told Patch the family traces its farming roots there to 1728. She described the handoff this way:
"They kind of ran out of family members that were willing to run the seasonal farm market, and so they wanted to keep it going. And they asked us if we would be interested in renting it."
So the stand has always been a tenant. TAPinto Bridgewater/Raritan reports it has operated as a non-conforming use, meaning it carried on under the zoning without being one of the uses that zoning allows. NJ.com reported that the property is listed for sale. A long-running stand on land that is up for sale, with no zoning status of its own, was always one transaction away from losing its spot.
That nearly happened. In March 2025, Patch reported on the first version of the storage plan. It would have torn down both the farm stand at 351 Route 28 and the vacant Tectonic office building at 322 Route 22 to make room for a three-story facility of 120,570 square feet.
The application went through seven zoning board hearings over 20 months. Bridgewater Storage attorney Matthew G. Capizzi said his client made the building smaller, changed the color scheme, added faux windows, revised the landscaping and traffic pattern, and agreed to keep the farmstand. The board approved it 5 to 2. Chairman John Kulak, Vice Chairman James Weideli and members John Colucci, Pushpavati Amin and Andrew Fresco voted yes. Christine Henderson Rose and James Franco voted no.
Here is how the site compares under the approved plan, based on reporting from TAPinto and NJ.com:
| Before the Oct. 13 vote | Under the approved plan | |
|---|---|---|
| Zoning status of the stand | Non-conforming use | Variance makes it an approved use |
| Building | Existing two-story stand | Same building kept, upgraded with new utilities and a bathroom |
| Parking | About 10 spaces | New gravel lot with 10 spaces |
| Landowner | Private owner, property listed for sale | Bridgewater Storage, charging rent to the operator |
| Lease terms | Rental arrangement | Proposed 10 years, with a possible 10-year extension |
| 1800s Kiser farmhouse | Standing | To be removed |
The longest-lasting condition is in the paperwork. According to TAPinto, board attorney Richard Oller said the certificate of occupancy for the whole site will not be approved unless it includes clauses allowing a farmstand to operate. Once that is done, a farmstand stops being a leftover from the old zoning. It becomes a condition of using the property.
In his summary at the hearing, Kulak reminded the room that some of the alternatives people preferred, including offices, medical buildings and nursing homes, are already permitted on the site and would never have come before the zoning board. He also said those uses would bring more traffic than self-storage. The storage plan did need variances, and the farmstand conditions are part of the approval those variances produced.
Many residents still opposed it. Twenty-five people spoke against the plan at the final hearing. Their concerns included traffic, setbacks from Route 22, the building's size and how visible it would be from Route 28, and whether Bridgewater needs another storage facility at all. An attorney for Bridgewater Residents United argued that the township's 2025 master plan allows self-storage in only one business zone, and this site is not in it. At the September hearing, NJ.com reported, Henderson Rose asked opponents, "You're getting the farm stand. What am I missing?" At the October hearing, she voted no, saying the master plan needed to be protected.
The certificate of occupancy requires a farmstand. It does not name the Melicks. Oller said it can't name a specific operator, because the operator's lease is a private agreement.
That private agreement does not exist yet. At the Oct. 13 meeting, Rebecca Melick submitted a letter from her attorney disputing the developer's statements that the two sides had reached a deal. TAPinto reported her concern that nothing would be final until the township fully approves and reviews the application, which leaves open the possibility that Bridgewater Storage could back out of the farmstand agreement. Capizzi and Oller both said Bridgewater Storage can't sign a lease on land it doesn't own yet. Capizzi pointed to his statement at the Sept. 22 meeting offering the Melicks 10 years plus a possible 10-year extension.
In September, NJ.com reported that she was glad the stand would be saved but skeptical of the revised plans, and that Capizzi had called her about the changes the afternoon before that hearing. After the vote, NJ.com reported that she was disappointed the variances passed and worried the storage company might not keep its promise, since no lease with her business was written into the approval. The same report said a member of Bridgewater Residents United plans to pursue an appeal. The site is now required to have a farmstand, while the lease that would keep this particular family running it can't be signed until the sale closes. None of the reporting gives a date for the sale or for construction.
The 1800s Kiser farmhouse is slated for removal under the approved plan. NJ.com reports that a resident has lived there for the past three years. According to Patch, a township planner testified that the house was reviewed in 1989 and found ineligible for historic designation.
Through all of this, the stand has stayed open as usual. The Melick family's Bridgewater Farm Market page describes a season that winds down gradually:
The page's printed opening and closing dates don't give a year, so calling ahead is the reliable way to confirm the 2026 schedule. If the stand follows its usual pattern, Saturday, Oct. 31, ends the daily run, and Thanksgiving falls on Nov. 26. The stand is also a CSA pickup location. The page promotes a fall pumpkin patch but also says there is no pick-your-own at this location, so ask before you plan a picking trip.
Melick told Patch that regulars come for "peaches, corn, and tomatoes." For anyone who wants Melick's after Thanksgiving, NJ.com notes the family also runs a farm market in Oldwick and an orchard and cider mill in Califon. Patch describes the Oldwick market as open year-round.
The approval now requires a farmstand on the site. Whether the Melicks will be the ones running it next summer depends on a lease that can't be signed until the property sale closes.
If the Route 28 stand is part of your summers, Karen Gray is happy to share updates on the corner as the township's process moves forward. Let's Connect.
Working with Karen means partnering with a trusted advisor who brings market expertise, thoughtful strategy, and a client-first approach to every transaction. Known for her professionalism, attention to detail, and calm guidance, Karen ensures a seamless experience from the first conversation through closing.